Published 1977 | Version v1
Book

Some problems encountered in the instillation of core and associated components for the Hartlepool and Heysham AGRs

  • 1. General Electric Co. Reactor Equipment Ltd., Whetstone (UK)

Description

The paper contains a brief outline of the design emphasising those items that were not detailed in previous papers. The items covered include the core, core support and restraint structure, the 'in-vessel' parts of secondary shut down and tertiary shutdown systems, and fuel plug units. There has been a continuous development of engineering and quality requirements for these items since the initial tender for Hartlepool in 1968. The method of incorporating these requirements in both manufacturing works and at site are described. The present method of controlling the quality and documentation through these stages will be presented. (author)

Additional details

Publishing Information

Publisher
Mechanical Engineering Pub. Ltd. for the Institution of Mechanical Engineers.
Imprint Place
London
Imprint Title
Conference on the construction, commissioning and operation of Advanced Gas-cooled Reactors, sponsored by the Nuclear Energy Group of The Institution of Mechanical Engineers and The British Nuclear Energy Society, Institution Headquarters, 26-27 May 1977
Journal Page Range
p. 15-20.

Conference

Title
Conference on the construction, commissioning and operation of Advanced Gas Cooled Reactors.
Dates
26 - 27 May 1977.
Place
London, UK.