Published 2004
| Version v1
Miscellaneous
Approach regarding the implantation of S-98 reliability program at the Gentilly 2 Power Plant considering AP-913 equipment reliability process
- 1. Hydro-Quebec, Gentilly 2 Nuclear Generating Station, Quebec (Canada)
Description
The Canadian Nuclear Safety Commission incorporates a new Regulatory Standard S-98, Reliability Program for Nuclear Power Plants. The licensees shall be conform to standard's requirements by the end of 2005. This paper presents the approach adopted at Hydro-Qu ec (Nuclear Power Plant Gentilly 2) to meet S-98 requirements considering the WANO/INPO AP-913 Equipment Reliability Process. (author)
Additional details
Publishing Information
- Publisher
- Canadian Nuclear Society, Toronto, Ontario, Canada.
- Imprint Place
- Toronto, Ontario (Canada)
- ISBN
- 0-919784-79-8
- Imprint Title
- Nuclear energy: meeting the challenges
- Imprint Pagination
- 159 Megabytes
- Journal Page Range
- [9 p.]
Conference
- Title
- 25. annual CNS conference
- Dates
- 6-9 Jun 2004
- Place
- Toronto, Ontario (Canada)
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 36028815
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- CANADIAN AECB; GENTILLY REACTOR; NUCLEAR POWER PLANTS; REGULATORY GUIDES; RELIABILITY
- Descriptors DEC
- CANADIAN ORGANIZATIONS; CANDU TYPE REACTORS; DOCUMENT TYPES; HEAVY WATER MODERATED REACTORS; HWLWR TYPE REACTORS; NATIONAL ORGANIZATIONS; NATURAL URANIUM REACTORS; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTORS; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS
Optional Information
- Notes
- 11 refs., 2 tabs., 3 figs.