Published April 1991 | Version v1
Report

Critical safety parameters: The logical approach to refresher training

  • 1. New Brunswick Power, Point Lepreau (Canada)

Description

Nuclear power plant managers must ensure that control room staff are able to perform effectively. This is of particular importance through the longer term after initial authorization. Traditionally refresher training has been based on delivery of fragmented training packages typically derived from the initial authorization training programs. Various approaches have been taken to provide a more integrated refresher training program. However, methods such as job and task analysis and subject matter expert derived training have tended to develop without a focused clear overall training objective. The primary objective of all control room staff training is to ensure a proper and safe response to all plant transients. At the Point Lepreau Nuclear Plant, this has defined the Critical Safety Parameter based refresher training program. The overall objective of the Critical Safety Parameter training program is to ensure that control room staff can monitor and control a discrete set of plant parameters. Maintenance of the selected parameters within defined boundaries assures adequate cooling of the fuel and containment of radioactivity. Control room staff need to be able to reliably respond correctly to plant transients under potentially high stress conditions,. utilizing the essential knowledge and skills to deal with such transients. The inference is that the knowledge and skills must be limited to that which can be reliably recalled. This paper describes how the Point Lepreau Nuclear Plant has developed a refresher training program on the basis of a limited number of Critical Safety Parameters. Through this approach, it has been possible to define the essential set of knowledge and skills which ensures a correct response to plant transients

Additional details

Publishing Information

Imprint Title
Proceedings of the ninth symposium on the training of nuclear facility personel
Imprint Pagination
623 p.
Journal Page Range
p. IV.B.3.1-IV.B.3.23.
Report number
CONF-9104135--

Conference

Title
9. symposium on the training of nuclear facility personnel.
Dates
14-18 Apr 1991.
Place
Denver, CO (United States).