Published November 1998
| Version v1
Report
Construction status of the KEKB 8-GeV injector linac
Creators
- 1. High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan)
Description
The KEKB (B-factory at KEK) 8-GeV injector linac is under construction by upgrading the existing 2.5-GeV injector as well as extending the linac towards the upstream site. This upgrade has been almost completed and the two linacs are presently being combined. This paper describes the construction status, with emphasis on the newly developed beam monitors being used for various stages of beam commissioning. (author)
Additional details
Identifiers
- URL
- http://www.kek.jp;
Publishing Information
- Imprint Title
- Proceedings of the first Asian particle accelerator conference (APAC98)
- Imprint Pagination
- 960 p.
- Journal Page Range
- p. 292-294
- Report number
- KEK-PROC--98-10
Conference
- Title
- 1. Asian particle accelerator conference
- Acronym
- APAC98
- Dates
- 23-27 Mar 1998
- Place
- Tsukuba, Ibaraki (Japan)
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 31007222
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- BEAM BUNCHING; BEAM MONITORS; COMMISSIONING; ELECTRON BEAM INJECTION; ELECTRON BEAMS; LINEAR ACCELERATORS; POSITRON BEAMS; STREAK CAMERAS
- Descriptors DEC
- ACCELERATORS; BEAM DYNAMICS; BEAM INJECTION; BEAMS; CAMERAS; DYNAMICS; LEPTON BEAMS; MEASURING INSTRUMENTS; MECHANICS; MONITORS; PARTICLE BEAMS