Published November 1998 | Version v1
Report

Construction status of the KEKB 8-GeV injector linac

  • 1. High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan)

Description

The KEKB (B-factory at KEK) 8-GeV injector linac is under construction by upgrading the existing 2.5-GeV injector as well as extending the linac towards the upstream site. This upgrade has been almost completed and the two linacs are presently being combined. This paper describes the construction status, with emphasis on the newly developed beam monitors being used for various stages of beam commissioning. (author)

Part of:
Proceedings of the first Asian particle accelerator conference (APAC98)

Additional details

Identifiers

Publishing Information

Imprint Title
Proceedings of the first Asian particle accelerator conference (APAC98)
Imprint Pagination
960 p.
Journal Page Range
p. 292-294
Report number
KEK-PROC--98-10

Conference

Title
1. Asian particle accelerator conference
Acronym
APAC98
Dates
23-27 Mar 1998
Place
Tsukuba, Ibaraki (Japan)

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
31007222
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BEAM BUNCHING; BEAM MONITORS; COMMISSIONING; ELECTRON BEAM INJECTION; ELECTRON BEAMS; LINEAR ACCELERATORS; POSITRON BEAMS; STREAK CAMERAS
Descriptors DEC
ACCELERATORS; BEAM DYNAMICS; BEAM INJECTION; BEAMS; CAMERAS; DYNAMICS; LEPTON BEAMS; MEASURING INSTRUMENTS; MECHANICS; MONITORS; PARTICLE BEAMS

Optional Information