Delay consequencies in the construction time-schedule of nuclear power plants in relation to its safety and quality
Description
An important delay in the construction time-schedule of a Nuclear Power Plant affects its safety and quality. This mainly occurs as a consequence of four reasons: discontinuity of the personnel working for the project; discontinuities of project suppliers; new safety and quality concepts; long-term storage. This work analyses each of the above reasons so as to foresee countermeasures to garantee the non deterioration of a Nuclear Power Plant. (author)
Availability note (English)
Available from the Library of Comissao Nacional de Energia Nuclear, RJ, Brazil.Additional details
Additional titles
- Original title (Spanish)
- Consequencias del atraso de los cronogramas de construccion de una central nuclear sobre la seguridad y la calidad
Publishing Information
- Imprint Title
- Proceedings of the Symposium on Safety of Nuclear Power Plants in Latin America
- Imprint Pagination
- 569 p.
- Journal Page Range
- p. 303-311.
Conference
- Title
- Symposium on Safety of Nuclear Power Plants in Latin America.
- Dates
- 9-13 Jun 1991.
- Place
- Rio de Janeiro, RJ (Brazil).
INIS
- Country of Publication
- Brazil
- Country of Input or Organization
- Brazil
- INIS RN
- 22091428
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ATUCHA-2 REACTOR; CONSTRUCTION; ECONOMICS; PLANNING; QUALITY CONTROL; REACTOR SAFETY
- Descriptors DEC
- CONTROL; HEAVY WATER COOLED REACTORS; HEAVY WATER MODERATED REACTORS; NATURAL URANIUM REACTORS; PHWR TYPE REACTORS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTORS; SAFETY; THERMAL REACTORS
Optional Information
- Notes
- Imprint:Anais do Simposio sobre Aspectos de Seguranca de Usinas Nucleares na America Latina.