Published July 1, 2003
| Version v1
Report
Design of the Jefferson Lab IR Upgrade FEL optical cavity
Description
Jefferson Lab is in the process of upgrading the Free-Electron Laser Facility to provide higher output power as well as broader wavelength and timing flexibility. As part of the upgrade, a new optical cavity is being constructed. Using a near-concentric configuration, it will provide high average power (10kW) output using one of three sets of dielectrically coated mirrors. A fourth mirror set will provide broadband tuning throughout the mid-IR, but at a lower average power of 1kW. The new optical cavity offers unique features such as in vacuo active stabilization of the mirror orientation and deformable high-reflector mirrors. The status of the construction of the optical cavity and a review of its capabilities will be presented
Availability note (English)
Available from PURL: https://www.osti.gov/servlets/purl/826160-RGqAhy/native/Additional details
Identifiers
Publishing Information
- Imprint Pagination
- 174.5 Kilobytes
- Report number
- JLAB-ACT--02-103
Conference
- Title
- FEL 2002
- Dates
- 8-13 Sep 2002
- Place
- Chicago, IL (United States)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 35076944
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- CEBAF ACCELERATOR; DESIGN; FREE ELECTRON LASERS; INTERMEDIATE INFRARED RADIATION; MIRRORS; OPTICAL EQUIPMENT; ORIENTATION; STABILIZATION; TUNING; WAVELENGTHS
- Descriptors DEC
- ACCELERATORS; ELECTROMAGNETIC RADIATION; EQUIPMENT; INFRARED RADIATION; LASERS; LINEAR ACCELERATORS; RADIATIONS
Optional Information
- Contract/Grant/Project number
- AC05-84ER40150
- Notes
- published in Nuclear Instruments and Methods in Physics Research Section A, Vol: 507, Issue: 1-2
- Funding organization
- USDOE Office of Energy Research (ER) (United States)
- Secondary number(s)
- DOE/ER--40150-2818