Published February 15, 1986 | Version v1
Journal article

Progress report on the HI-13 tandem accelerator

Description

At the Institute of Atomic Energy, Beijing China, the installation of a 13 MV tandem accelerator facility, including all buildings and auxiliary equipment, has been totally completed. The progress report on every aspect of this machine including building, tank, injector system, vacuum system, generator, gas handling system and experimental equipment is presented. Preliminary voltage tests started in September 1984. A terminal voltage of over 12 MV at a SF6 pressure of 90 psig with the tubes installed was achieved in January 1985. (orig.)

Additional details

Publishing Information

Journal Title
Nucl. Instrum. Methods Phys. Res., Sect. A
Journal Volume
244
Journal Issue
1/2
Series
Nucl. Instrum. Methods Phys. Res., Sect. A.
Journal Page Range
39-47
ISSN
0168-9002
CODEN
NIMAE

Conference

Title
4. international conference on electrostatic accelerator technology and associated boosters.
Dates
15-19 Apr 1985.
Place
Buenos Aires (Argentina).

INIS

Country of Publication
Netherlands
Country of Input or Organization
Netherlands
INIS RN
17040159
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ACCELERATOR FACILITIES; BEAM INJECTION; BEAM TRANSPORT; TANDEM ELECTROSTATIC ACCELERAT; TUBES; VACUUM SYSTEMS
Descriptors DEC
ACCELERATORS; ELECTROSTATIC ACCELERATORS