Published October 27, 1994 | Version v1
Report Open

Multi-beam Mossbauer scattering facility. Final technical report

Description

The Mossbauer instrument construction which was financed by the DOE grant of $74,065 and MU matching funds of $52,000 is essentially completed and awaiting installation at the Missouri University Research Reactor (MURR) facility. All of the DOE funds have been spent and all of the matching funds plus about $4,000 to $5,000 of additional physics department funds have been committed to finishing the first phase of the new instrument, QUEGS--II (for QUAsiElastic Gamma-ray Scattering--generation II). This phase includes computer controls, detectors, and instrumentation for two of the four beam lines afforded by QUEGS-II. Included in this commitment of funds is $8,700 for equipment and machine shop services which have not yet been paid and $19,700 for a Ge detector for which bids are ready to be let

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95003285; NTIS; US Govt. Printing Office Dep.

Files

26033949.pdf

Files (496.4 kB)

Name Size Download all
md5:f0f27623bbe35959d603eb08e6bbf09b
496.4 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
2 p.
Report number
DOE/ER/79044--T1

Optional Information

Contract/Grant/Project number
Contract FG05-91ER79044
Funding organization
USDOE, Washington, DC (United States).