Published May 15, 1975
| Version v1
Report
Restricted
Summary of the LLTV support loads
Description
The analytical procedure used to determine the maximum upward directed load into the Large Leak Test Vessel support arrangement is discussed. A number of loading cases are analyzed and the results summarized. The maximum load into the Building 059 highbay floor is compared to the floor structural capacity and is found to be acceptable
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01 as DE82011270.
Files
Additional details
Additional titles
- Augmented title (English)
- LMFBR
Publishing Information
- Imprint Pagination
- 15 p.
- Report number
- DOE/NBM--2011270
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 13695949
- Subject category
- S61: RADIATION PROTECTION AND DOSIMETRY; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- DYNAMIC LOADS; FAILURES; LMFBR TYPE REACTORS; MOLTEN METAL-WATER REACTIONS; REACTOR SAFETY; STEAM GENERATORS; STRESS ANALYSIS; SUPPORTS
- Descriptors DEC
- BOILERS; BREEDER REACTORS; EPITHERMAL REACTORS; FAST REACTORS; FBR TYPE REACTORS; LIQUID METAL COOLED REACTORS; MECHANICAL STRUCTURES; REACTORS; SAFETY; VAPOR GENERATORS