Water electrolysis system

  • 1. Nissho Iwai Corp., Osaka (Japan)

Description

Nissho Iwai Co. and Ebara Co. received an order for hydrogen and oxygen generating system (water electrolysis system) to be installed at Tokai-2 power station of The Japan Atomic Power Company, following the previous order at Tsuruga-1 where the gas injection from FY1996 is planned. Hydrogen gas generated by the system will be injected to coolant of boiling water reactors to improve corrosive environment. The system is being offered by a tripartite party, Nissho Iwai, Ebara, and Norsk Hydro Electrolysers of Norway (NHEL). NHEL provides a electrolyser unit, as a core of the system. Ebara provides procurement, installation, and inspection as well as total engineering work, under the basic design by NHEL which has over 60 years-experience in this field. (author)

Additional details

Publishing Information

Journal Title
FAPIG (Tokyo)
Journal Issue
no.142
Journal Page Range
p. 20-25.
ISSN
0014-5645
CODEN
FPIGAG