The cross section of cables in nuclear power plant is larger than those in civil projects as its long laying route, so mismatching of cable with equipment terminal is common. Altering terminal design or increasing cable connection cabinet can solve this problem on the one hand, but increasing the construction cost and period on the other. This paper puts forward a refined method to cable type selection and length validation. This helps reduce the cost by reducing the number of cable connection cabinet. (authors)
Additional details
Identifiers
Publishing Information
- Journal Title
- China Nuclear Power
- Journal Volume
- 10
- Journal Issue
- 1
- Journal Page Range
- p. 130-132, 68
- ISSN
- 1674-1617
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 53065015
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- DESIGN; ECONOMIC ANALYSIS; ELECTRIC CABLES; ELECTRICAL EQUIPMENT; LENGTH; NUCLEAR POWER PLANTS; OPTIMIZATION; VALIDATION
- Descriptors DEC
- CABLES; CONDUCTOR DEVICES; DIMENSIONS; ECONOMICS; ELECTRICAL EQUIPMENT; EQUIPMENT; NUCLEAR FACILITIES; POWER PLANTS; TESTING; THERMAL POWER PLANTS
Optional Information
- Notes
- 2 tabs., 5 refs.; http://dx.doi.org/10.12058/zghd.2017.01.130