Published May 12, 1997
| Version v1
Report
Open
PUREX new substation ATR
Description
This document is the acceptance test report (ATR) for the New PUREX Main and Minisubstations. It covers the factory and vendor acceptance and commissioning test reports. Reports are presented for the Main 5 kV substation building, the building fire system, switchgear, and vacuum breaker; the minisubstation control building and switch gear; commissioning test; electrical system and loads inspection; electrical utilities transformer and cable; and relay setting changes based on operational experience
Availability note (English)
Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99051015; NTIS; US GOVT. PRINTING OFFICE DEP.Files
30053099.pdf
Files
(5.1 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:2608b08b30c82dae8703147c18f45689
|
5.1 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 328 p.
- Report number
- HNF-SD-CP-ATR--089
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 30053099
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- ELECTRICAL EQUIPMENT; FUEL REPROCESSING PLANTS; HANFORD RESERVATION; MONITORING; PERFORMANCE TESTING; POWER SUBSTATIONS; SURPLUS NUCLEAR FACILITIES
- Descriptors DEC
- EQUIPMENT; NATIONAL ORGANIZATIONS; NUCLEAR FACILITIES; TESTING; US DOE; US ORGANIZATIONS
Optional Information
- Contract/Grant/Project number
- Contract AC06-96RL13200
- Funding organization
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)