Published September 2013
| Version v1
Journal article
Analysis for the risk of grid transients on PWR nuclear power plant operation
Creators
- 1. Research Institute of Nuclear Power Operation, Wuhan (China)
- 2. Shandong Nuclear Power Co., Ltd., Haiyang (China)
Description
An analysis for the potential adverse effects of grid transients on PWR nuclear power plant operation is performed, and the treatment plan is put forward in this paper, with an aim to ensure the operators to respond timely and correctly to the grid transients. Sufficient operation directions are also provided for the operators to conservatively monitor the operation of PWR nuclear power plant. (authors)
Additional details
Publishing Information
- Journal Title
- China Nuclear Power
- Journal Volume
- 6
- Journal Issue
- 3
- Journal Page Range
- p. 268-274
- ISSN
- 1674-1617
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 48083383
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- GRIDS; MONITORS; NUCLEAR POWER PLANTS; OPERATION; PWR TYPE REACTORS; RISK ASSESSMENT; TRANSIENTS
- Descriptors DEC
- ELECTRODES; ENRICHED URANIUM REACTORS; MEASURING INSTRUMENTS; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; REACTORS; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 12 refs.