Published July 1992
| Version v1
Report
Regulatory/operability issues inservice testing
Description
Temporary Instruction (TI) 2515/114, Inspection Requirements for Generic Letter 89-04, Acceptable Inservice Testing Programs, was issued January 15, 1992, to provide uniform guidance for the NRC inspection of activities related to inservice testing (IST) of pumps and valves with particular emphasis on the positions in Generic Letter 89-04, Guidance on Developing Acceptable Inservice Testing programs, dated April 3, 1989. The TI was issued for one trial inspection in each of the five regions, with subsequent inspection to be determined based on the results from these trial inspections. Region III, Point Beach Nuclear Plant, was the first inspection performed to the TI. Region 4, Wolf Creek, followed
Additional details
Publishing Information
- Imprint Title
- Proceedings of the second NRC/ASME symposium on pump and valve testing
- Imprint Pagination
- 598 p.
- Journal Page Range
- p. 549-550.
- Report number
- NUREG/CP--0123
Conference
- Title
- 2. Nuclear Regulatory Commission (NRC)/American Society of Mechanical Engineers (ASME) symposium on pump and valve testing.
- Dates
- 21-23 Jul 1992.
- Place
- Washington, DC (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 24015938
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- AVAILABILITY; IN-SERVICE INSPECTION; PERFORMANCE; PERFORMANCE TESTING; POINT BEACH-1 REACTOR; POINT BEACH-2 REACTOR; PUMPS; PWR TYPE REACTORS; RELIABILITY; US NRC; VALVES; WOLF CREEK-1 REACTOR
- Descriptors DEC
- CONTROL EQUIPMENT; ENRICHED URANIUM REACTORS; EQUIPMENT; FLOW REGULATORS; INSPECTION; NATIONAL ORGANIZATIONS; POWER REACTORS; REACTORS; TESTING; THERMAL REACTORS; US ORGANIZATIONS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Secondary number(s)
- EGG--2676; CONF-920732--.