Published 1995 | Version v1
Report Open

Unsaturated zone flow modeling for GWTT-95

Description

In accordance with the Nuclear Regulatory Commission regulation regarding groundwater travel times at geologic repositories, various models of unsaturated flow in fractured tuff have been developed and implemented to assess groundwater travel times at the potential repository at Yucca Mountain, Nevada. Kaplan used one-dimensional models to describe the uncertainty and sensitivity of travel times to various processes at Yucca Mountain. Robey and Arnold et al. used a two-dimensional equivalent continuum model (ECM) with inter- and intra-unit heterogeneity in an attempt to assess fast-flow paths through the unsaturated, fractured tuff at Yucca Mountain (GWTT-94). However, significant flow through the fractures in previous models was not simulated due to the characteristics of the ECM, which requires the matrix to be nearly saturated before flow through the fractures is initiated. In the current study (GWTT-95), four two-dimensional cross-sections at Yucca Mountain are simulated using both the ECM and dual-permeability (DK) models. The properties of both the fracture and matrix domains are geostatistically simulated, yielding completely heterogeneous continua. Then, simulations of flow through the four cross-sections are performed using spatially nonuniform infiltration boundary conditions. Steady-state groundwater travel times from the potential repository to the water table are calculated

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE96003708; NTIS; US Govt. Printing Office Dep.

Files

27041008.pdf

Files (322.9 kB)

Name Size Download all
md5:80e997672e5709853d042e99dd55186c
322.9 kB Preview Download

Additional details

Additional titles

Augmented title (English)
Yucca Mountain Project

Publishing Information

Imprint Pagination
8 p.
Report number
SAND--95-2497C

Conference

Title
11. international conference on packaging and transportation of radioactive materials.
Acronym
PATRAM '95
Dates
3-8 Dec 1995.
Place
Las Vegas, NV (United States).

Optional Information

Contract/Grant/Project number
Contract AC04-94AL85000
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-951203--20.