Published June 18, 2001 | Version v1
Report Open

COMMISSIONING OF THE RELATIVISTIC HEAVY ION COLLIDER

Description

This report describes in detail steps performed in bringing the Relativistic Heavy Ion Collider (RHIC) from the commissioning into the operational stage when collisions between 60 bunches of fully striped gold ions, were routinely provided. Corrections of the few power supplies connections by the beam measurements are described. Beam lifetime improvements at injection, along the acceleration are shown. The beam diagnostic results; like Schottky detector, beam profile monitor, beam position monitors, tune meter and others, are shown [1]

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00782965; PURL: https://www.osti.gov/servlets/purl/782965-TPEBOT/native/

Files

32067997.pdf

Files (300.6 kB)

Name Size Download all
md5:51271baddc8503657a44ecb21dee828f
300.6 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
BNL--67969

Conference

Title
Particle Accelerator Conference (PAC 2001)
Dates
18-22 Jun 2001
Place
CHICAGO, IL (United States)

Optional Information

Contract/Grant/Project number
AC02-98CH10886
Funding organization
USDOE Office of Energy Research (ER) (United States)
Secondary number(s)
KA--0201