Published May 2012 | Version v1
Miscellaneous

Survey and Positioning of the 100MeV Linear Accelerator

  • 1. Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

Description

Proton Engineering Frontier Project(PEFP) is developing a 100MeV high-duty-factor proton linac. The accelerator is composed with a 50keV proton injector, a 3MeV RFQ, DTL tanks and a beam dump. Additionally 10 beamlines are also developing to supply the 20MeV and the 100MeV proton beam for the proton beam application. As an installation process, we built the align network and did the survey work with laser trackers. On the basis of the survey result, all of the accelerator components were positioned in the tunnel. In the same time, the 20MeV linear accelerator operated until the end of last year was delivered from the KAERI to Gyeongju site

Part of:
Proceedings of Korean Nuclear Society, Daejeon (KR)

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS spring meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2012 spring meeting of the KNS
Dates
16-18 May 2012
Place
Jeju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
43073711
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
LINEAR ACCELERATORS; POSITIONING; PROTON BEAMS; PROTONS; SURVEY MONITORS
Descriptors DEC
ACCELERATORS; BARYONS; BEAMS; ELEMENTARY PARTICLES; FERMIONS; HADRONS; MEASURING INSTRUMENTS; MONITORS; NUCLEON BEAMS; NUCLEONS; PARTICLE BEAMS; RADIATION MONITORS

Optional Information

Notes
4 refs, 6 figs