Survey and Positioning of the 100MeV Linear Accelerator
- 1. Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)
Description
Proton Engineering Frontier Project(PEFP) is developing a 100MeV high-duty-factor proton linac. The accelerator is composed with a 50keV proton injector, a 3MeV RFQ, DTL tanks and a beam dump. Additionally 10 beamlines are also developing to supply the 20MeV and the 100MeV proton beam for the proton beam application. As an installation process, we built the align network and did the survey work with laser trackers. On the basis of the survey result, all of the accelerator components were positioned in the tunnel. In the same time, the 20MeV linear accelerator operated until the end of last year was delivered from the KAERI to Gyeongju site
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Daejeon (Korea, Republic of)
- Imprint Title
- Proceedings of the KNS spring meeting
- Imprint Pagination
- [1 CD-ROM]
- Journal Page Range
- [2 p.]
Conference
- Title
- 2012 spring meeting of the KNS
- Dates
- 16-18 May 2012
- Place
- Jeju (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 43073711
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- LINEAR ACCELERATORS; POSITIONING; PROTON BEAMS; PROTONS; SURVEY MONITORS
- Descriptors DEC
- ACCELERATORS; BARYONS; BEAMS; ELEMENTARY PARTICLES; FERMIONS; HADRONS; MEASURING INSTRUMENTS; MONITORS; NUCLEON BEAMS; NUCLEONS; PARTICLE BEAMS; RADIATION MONITORS
Optional Information
- Notes
- 4 refs, 6 figs