Published June 2014 | Version v1
Report Open

Radiation protection management in Fukushima Daiichi NPS and post-accident measures

  • 1. Tokyo Electric Power Company (Japan)

Description

Fukushima Daiichi Nuclear Power Station was hit by the big earthquake and tsunami, which caused the station black out and subsequent loss of cooling functions for reactor and spent fuel pools (SFPs). Consequently the fuels were damaged, hydrogen explosion blew off top of the reactor buildings and radioactive materials were released to the atmosphere and the ocean. Tsunami and power loss caused many difficulties of monitoring, dose management, and radiation protection of workers. For example, the radiation management system was down and about 5,000 Alarm Pocket Dosimeters (APDs) and their battery chargers could not be used. Due to the insufficient number of APDs, one representative of each working team had a dosimeter under the limited conditions. Through the accident, we got following lessons learned; (1) Reinforcing monitoring posts, (2) Preparing more radiation protection equipment, (3) Establishing emergency access control centre, and (4) Education and training in radiation protection. (author)

Files

45089851.pdf

Files (3.1 MB)

Name Size Download all
md5:a40182890dbb445645099db3be2f3bf0
3.1 MB Preview Download
Part of:
Proceedings of the International Workshop on Occupational Radiation Protection in Severe Accident Management 'sharing practices and experiences'

Additional details

Publishing Information

Imprint Title
Proceedings of the International Workshop on Occupational Radiation Protection in Severe Accident Management 'sharing practices and experiences'
Imprint Pagination
350 p.
Journal Page Range
p. 21, 157-198
Report number
NEA-ISOE--06-2014

Conference

Title
International Workshop on Occupational Radiation Protection in Severe Accident Management 'sharing practices and experiences'
Dates
17-18 Jun 2014
Place
Washington DC (United States)

Optional Information