2001 replacement plan of main component for Genkai nuclear power plant unit 1 and 2

  • 1. Kyushu Electric Power CO., INC., Fukuoka (Japan)

Description

The commercial operation of Genkai unit 1 started in October 1975 and Genkai unit 2 in March 1981. Each of them is a two-loop type PWR plant whose output is 559 MW. Until now Genkai unit 1 and 2 have been operating satisfactorily with good operating performance since their commercial operation started. Meantime we have made efforts to improve the reliability of facilities and their functions by systematically performing improvement and repair work reflecting the lessons learned from operation experience of nuclear power plants at home and abroad and the result of technical development. We have decided to replace main component during the 20. outage of Genkai unit 1 and the 16. outage of Genkai unit 2 which are scheduled in March 2001, in order to reduce future radiation exposure and to improve the reliability. (author)

Availability note (English)

Available from INIS in electronic form

Files

33010839.pdf

Files (204.2 kB)

Name Size Download all
md5:5375bb0a5c3ad7fbfa42ab1de77b0ac8
204.2 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
[7 p.]
Report number
INIS-FR--776

Conference

Title
9. international conference on nuclear engineering
Dates
8-12 Apr 2001
Place
Nice Acropolis (France)