Published July 2011 | Version v1
Journal article

Practical operation strategies for pumped hydroelectric energy storage (PHES) utilising electricity price arbitrage

  • 1. Department of Physics and Energy, University of Limerick, Limerick (Ireland)
  • 2. Department of Development and Planning, Aalborg University, Fibigerstraede 13, DK-9220 Aalborg (Denmark)

Description

In this paper, three practical operation strategies (24Optimal, 24Prognostic, and 24Hsitrocial) are compared to the optimum profit feasible for a PHES facility with a 360 MW pump, 300 MW turbine, and a 2 GWh storage utilising price arbitrage on 13 electricity spot markets. The results indicate that almost all (∼97%) of the profits can be obtained by a PHES facility when it is optimised using the 24Optimal strategy developed, which optimises the energy storage based on the day-ahead electricity prices. However, to maximise profits with the 24Optimal strategy, the day-ahead electricity prices must be the actual prices which the PHES facility is charged or the PHES operator must have very accurate price predictions. Otherwise, the predicted profit could be significantly reduced and even become a loss. Finally, using the 24Optimal strategy, the PHES profit can surpass the annual investment repayments required. However, over the 5-year period investigated (2005-2009) the annual profit from the PHES facility varied by more than 50% on five out of six electricity markets considered. Considering the 40-year lifetime of PHES, even with low investment costs, a low interest rate, and a suitable electricity market, PHES is a risky investment without a more predictable profit. - Highlights: → Electricity generators typically operate on a market, including energy storage. → This paper assesses how energy storage can maximise its profits on a market. → Four operating strategies are assessed on 13 markets using a case study.→ One operating strategy achieves 97% of the profits feasible.→ However, the profit varies a lot depending on the market and capital costs.

Availability note (English)

Available from http://dx.doi.org/10.1016/j.enpol.2011.04.032

Additional details

Identifiers

DOI
10.1016/j.enpol.2011.04.032;
PII
S0301-4215(11)00315-6;

Publishing Information

Journal Title
Energy Policy
Journal Volume
39
Journal Issue
7
Journal Page Range
p. 4189-4196
ISSN
0301-4215
CODEN
ENPYAC

Conference

Title
Electricity sector and renewable energy cum Hong Kong energy policy
Acronym
4. Asian energy conference
Dates
3 Dec 2010
Place
Hong Kong (Hong Kong)

INIS

Country of Publication
United Kingdom
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
43064371
Subject category
S29: ENERGY PLANNING, POLICY AND ECONOMY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CAPITALIZED COST; ECONOMIC POLICY; ELECTRICITY; ENERGY POLICY; ENERGY STORAGE; FORECASTING; INTEREST RATE; INVESTMENT; IRELAND; OPERATION; PRICES; PROFITS; SPOT MARKET; TURBINES
Descriptors DEC
COST; DEVELOPED COUNTRIES; EQUIPMENT; EUROPE; GOVERNMENT POLICIES; MACHINERY; MARKET; STORAGE; TURBOMACHINERY; WESTERN EUROPE

Optional Information

Copyright
Copyright (c) 2011 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.