WAED-HP-103, Health Physics Manual, Revision XII, March 1981. Final report

Description

The project scope of work included the complete decontamination and decommissioning (D and D) of the Westinghouse ARD Fuel Laboratories at the Cheswick Site in the shortest possible time. This has been accomplished in the following four phases: (1) preparation of documents and necessary paperwork; packaging and shipping of all special nuclear materials in an acceptable form to a reprocessing agency; (2) decontamination of all facilities, glove boxes and equipment; loading of generated waste into bins, barrels and strong wooden boxes; (3) shipping of all bins, barrels and boxes containing waste to the designated burial site; removal of all utility services from the laboratories; (4) final survey of remaining facilities and certification for nonrestricted use; preparation of final report. This attachment describes the responsibilities, standards, practices and procedures for radiaton protection and safety in the facilities of the Westinghouse Electric Corporation at Cheswick, Pennsylvania. In addition to the application of these standards and procedures, there is continual surveillance of the operations, equipment, and personnel to detect and correct any conditions which might create a health or accident hazard

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A24/MF A01 as DE82012035.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
566 p.
Report number
DOE/ET/37247--1-Attach.4