Gaseous radwaste system backfit design for the Surry nuclear station

Description

The two-unit pressurized water reactor Surry station, which began operation in 1972, included a pressurized tank gaseous radwaste system as part of its original design. This system, however, has had many operational problems; to alleviate these problems a replacement system employing an ambient temperature charcoal delay system has been designed. This design demonstrates the feasibility of installing and starting up a charcoal delay system in an operation nuclear power station while making extensive use of the existing tanks, valves, and piping

Additional details

Publishing Information

Journal Title
Trans. Am. Nucl. Soc.
Journal Volume
52
Series
Trans. Am. Nucl. Soc.
Journal Page Range
50-52
ISSN
0003-018X
CODEN
TANSA

Conference

Title
American Nuclear Society annual meeting.
Dates
15-20 Jun 1986.
Place
Reno, NV (USA).

Optional Information

Secondary number(s)
CONF-860610--Summs.