Environmental assessment of the nonradioactive wastewater control

Description

The U. S. Energy Research and Development Administration is planning to modify five N Plant discharges and one 100-KE plant discharge to the Columbia River as follows: The 66'' raw water return line discharge will be diverted into the 102'' line outfall. The N Plant filter backwash, coagulator sump wastes, and the regenerative wastes from the ion exchange resin will be diverted to concrete sumps and pumped to two settling ponds. A bar screen will be installed in the 181-N sump pit to prevent floating solids from returning to the river. The 183-KE filter backwash will be diverted to an existing empty sedimentation basin. The backwash will be allowed to settle, and water containing less than 30 mg/l suspended solids will be drained to the river. Nonsignificant potential adverse environmental impact has been identified

Availability note (English)

MF available from INIS under the Report Number.

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
UNI--548

Optional Information

Notes
Available from NTIS. $3.50.