Published June 1977
| Version v1
Report
Restricted
Capital cost: Boiling Water Reactor Plant. Commercial electric power cost studies
Description
Drawings, an equipment list, and a site description are presented for an 1190-MW(e) BWR power plant. The information was used in making a detailed capital cost estimate for such a plant
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS. $11.00.
Files
Additional details
Publishing Information
- Imprint Pagination
- v p.
- Report number
- COO--2477-6(Vol.2)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 9352644
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- BWR TYPE REACTORS; CAPITAL; CONSTRUCTION; COST; FORECASTING; INVESTMENT
- Descriptors DEC
- REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Secondary number(s)
- NUREG--0242(Vol.2).