Improvement and optimization of master/bypass valve switching process for steam generator level control of nuclear power plant
- 1. China Nuclear Power Co., Ltd., Shenzhen (China)
Description
According to the statistics of domestic nuclear power plant CPR1000 units, the common failure modes in the steam generator level control about the master/bypass valve switching process were described. The main modes include that the master/bypass valve switching threshold owes excellent, the master/bypass valve frequently switches and the master valve opens too late. And then a solution was raised about how to improve the master/bypass valve switching process, including switching point optimization, disturbance value control and difference control. This solution is performed in the project site and is verified feasible and effective. (authors)
Additional details
Identifiers
Publishing Information
- Journal Title
- Atomic Energy Science and Technology
- Journal Volume
- 49
- Journal Issue
- 3
- Journal Page Range
- p. 523-528
- ISSN
- 1000-6931
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 48088836
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- BYPASSES; CONTROL; DISTURBANCES; FAILURES; LEVELS; NUCLEAR POWER PLANTS; OPTIMIZATION; STEAM GENERATORS; SWITCHES; VALVES; WATER
- Descriptors DEC
- BOILERS; CONTROL EQUIPMENT; ELECTRICAL EQUIPMENT; EQUIPMENT; FLOW REGULATORS; HYDROGEN COMPOUNDS; NUCLEAR FACILITIES; OXYGEN COMPOUNDS; POWER PLANTS; THERMAL POWER PLANTS; VAPOR GENERATORS
Optional Information
- Notes
- 4 figs., 8 refs.; http://dx.doi.org/10.7538/yzk.2015.49.03.0523