Technical evaluation of the electrical, instrumentation, and control design aspects of the proposed license amendment Revision 1 for single-loop operation of the Monticello Nuclear Generating Plant, Unit 1 (Docket No. 50-263)

Description

This report documents the technical evaluation of the proposed changes to the plant reactor protection system by the licensee of Monticello Nuclear Generating Plant, Unit 1, to account for single-loop plant operation. This evaluation is restricted to only the electrical, instrumentation and control design aspects of proposed changes to the plant technical specifications for single-loop operation beyond 24 hours. The conclusion of the evaluation is that the license amendment for single-loop operation has met the review criteria provided anomalous control room indications are corrected or warning-tagged for the duration of single-loop operations

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE84004758.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
10 p.
Report number
UCID--19927