Published July 2005 | Version v1
Miscellaneous

Development of support foot for precise position alignment using airpad

  • 1. RIKEN Harima Inst., Mikazuki, Hyogo (Japan)
  • 2. ASAHI Kougyousho, Aioi, Hyogo (Japan)

Description

The 250 MeV accelerator test facility for the X-ray SASE-FEL project (SCSS Project) is under construction at SPring-8. In order to move and align the heavy components (for example, electron gun, klystrons, beamline tables, etc.) in precisely, we have developed the airpad system, which slides heavy components over the flat surface of the grinded concrete floor. In this paper, we report on the design and test results of the airpad system. (author)

Part of:
The 2nd annual meeting of Particle Accelerator Society of Japan and the 30th Linear Accelerator Meeting in Japan

Additional details

Publishing Information

Imprint Title
The 2nd annual meeting of Particle Accelerator Society of Japan and the 30th Linear Accelerator Meeting in Japan
Imprint Pagination
819 p.
Journal Page Range
p. 406-408

Conference

Title
2. annual meeting of Particle Accelerator Society of Japan and 30. Linear Accelerator Meeting in Japan
Dates
20-22 Jul 2005
Place
Tosu, Saga (Japan)

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
40085429
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATOR FACILITIES; ALIGNMENT; BUILDINGS; FLOORS; FREE ELECTRON LASERS; KLYSTRONS; LEVITATION; POSITIONING; POWERED SUPPORTS; PRESSURE CONTROL; SPRING-8 STORAGE RING
Descriptors DEC
CONTROL; ELECTRON TUBES; ELECTRONIC EQUIPMENT; EQUIPMENT; LASERS; MECHANICAL STRUCTURES; MICROWAVE EQUIPMENT; MICROWAVE TUBES; RADIATION SOURCES; STORAGE RINGS; SUPPORTS; SYNCHROTRON RADIATION SOURCES

Optional Information

Notes
2 refs., 6 figs., 1 tab.