Results of Salt Batch Qualification Testing

Description

This presentation: (1) Describes the Integrated Salt Disposition Project (ISDP), the newest operating facilities at the Savannah River Site for treating stored radioactive waste; (2) Reviews the past campaigns of salt disposition (Macrobatch 1 and 2); (3) Reviews current operations (Macrobatch 3); (4) Outlines the next qualification (Macrobatch 4); and (5) Discusses the limiters in operations. In 2001, the Department of Energy (DOE) identified Caustic-Side Solvent Extraction as the preferred processing option for removing cesium from SRS wastes. Similarly, the preferred method for removing alpha-emitting actinides and strontium is by sorption on monosodium titanate (MST). February 2004, DOE commissioned construction and operation of a pilot version (i.e., 11-34 L/min processing rate for salt solution) of these processes until construction of the full-scale Salt Waste Processing Facility (SWPF). The effort is known as the Integrated Salt Disposition Project. The combined facilities began radioactive operations in April of 2008.

Additional details

Publishing Information

Imprint Pagination
23 p.
Report number
S--08-06

Conference

Title
EM Waste Processing Technical Exchange 2010
Dates
16-18 Nov 2010
Place
Atlanta, GA (United States)

Optional Information

Contract/Grant/Project number
AC09-08SR22470
Funding organization
USDOE Assistant Secretary for Environmental Management (United States)
Secondary number(s)
SRNL-MS--2010-00250