Preventing cascading failure of electric power protection systems in nuclear power plant
- 1. KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)
Description
Cascading failure is the main cause of large blackouts in electrical power systems; this paper analyzes a cascading failure in Hanbit nuclear power plant unit two (2) caused by a circuit breaker (CB) operation failure. This malfunction has been expanded to the loss of offsite power (LOOP). In this study, current practices are reviewed and then the methodologies of how to prevent cascading failures in protection power systems are introduced. An overview on the implementation of IEC61850 GOOSE messaging-based zone selective interlocking (ZSI) scheme as key solution is proposed. In consideration of ZSI blocking time, all influencing factors such as circuit breaker opening time, relay I/O response time and messages travelling time in the communication network should be taken into account. The purpose of this paper is to elaborate on the effect of cascading failure in NPP electrical power protection system and propose preventive actions for this failures. Finally, the expected advantages and challenges are elaborated
Additional details
Publishing Information
- Journal Title
- Nuclear Engineering and Technology
- Journal Volume
- 53
- Journal Issue
- 1
- Series
- 19 refs, 8 figs, 4 tabs
- Journal Page Range
- p. 121-130
- ISSN
- 1738-5733
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 52113506
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Descriptors DEI
- COMMUNICATIONS; ELECTRIC POWER; FAILURES; IMPLEMENTATION; INTERLOCKS; LOSSES; NUCLEAR POWER PLANTS; OPENINGS; OPERATION; OUTAGES; POWER SYSTEMS; RELAYS; REVIEWS; SOLUTIONS; ZONES
- Descriptors DEC
- DISPERSIONS; DOCUMENT TYPES; ELECTRICAL EQUIPMENT; ENERGY SYSTEMS; EQUIPMENT; HOMOGENEOUS MIXTURES; MIXTURES; NUCLEAR FACILITIES; POWER; POWER PLANTS; THERMAL POWER PLANTS