Technical evaluation report on the Third 10-year Interval Inservice Inspection Program Plan: Florida Power and Light Company, Turkey Point Nuclear Power Plant, Units 3 and 4 (Docket Numbers 50-250 and 50-251)

Description

This report presents the results of the evaluation of the Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan, Revision 0, submitted September 9, 1993, including the requests for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, requirements that the licensee has determined to be impractical. The Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan is evaluated in Section 2 of this report. The inservice inspection (ISI) program plan is evaluated for (a) compliance with the appropriate edition/addenda of Section XI, (b) acceptability of the examination sample, (c) correctness of the application of system or component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC) reviews. The requests for relief are evaluated in Section 3 of this report

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as TI95008660; NTIS.

Files

26054898.pdf

Files (909.8 kB)

Name Size Download all
md5:2f68db6529e0ae444960f08d0fe59f3e
909.8 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
46 p.
Report number
INEL--95/0079

Optional Information