Published 1987 | Version v1
Journal article

High-burnup experience at Farley 1 and Point Beach 2

  • 1. Westinghouse Electric Corp., Nuclear Fuel Div., Pittsburgh, PA (USA)

Description

The economical use of fuel resources and spent-fuel storage benefits have encouraged the extension of fuel burnup. Westinghouse has conducted several fuel performance development programs to confirm the operational reliability of fuel at extended burnup. These programs have included both bounding duty evaluations in test reactors and standard production fuel assembly irradiations in commercial pressurized water reactors (PWRs). The optimized fuel assembly (OFA) high-burnup demonstration program, which included irradiating a total of ten OFA demonstration assemblies at four separate reactor sites, is a key element of the fuel assembly irradiation program

Additional details

Publishing Information

Journal Title
Transactions of the American Nuclear Society
Journal Volume
54
Journal Issue
1
Series
Trans. Am. Nucl. Soc.
Journal Page Range
91
ISSN
0003-018X
CODEN
TANSA

Conference

Title
13. American Nuclear Society international meeting on nuclear power plant operation.
Dates
30 Aug - 3 Sep 1987.
Place
Chicago, IL (USA).

Optional Information

Secondary number(s)
CONF-870837--.