Geophysics: Building E5375 decommissioning, Aberdeen Proving Ground

Description

Building E5375 was one of ten potentially contaminated sites in the Canal Creek area of the Edgewood section of Aberdeen Proving Ground examined by a geophysical team from Argonne National Laboratory in April and May 1992. Noninvasive geophysical surveys, including magnetics, electrical resistivity, and ground-penetrating radar (GPR), were conducted around the perimeter of the building to guide a sampling program prior to decommissioning and dismantling. Several anomalies wear, noted: (1) An underground storage tank located 25 ft east of Building E5375 was identified with magnetic, resistivity, and GPR profiling. (2) A three-point resistivity anomaly, 12 ft east of the northeast comer of Building E5374 (which borders Building E5375) and 5 ft south of the area surveyed with the magnetometer, may be caused by another underground storage tank. (3) A 2,500-gamma magnetic anomaly near the northeast corner of the site has no equivalent resistivity anomaly, although disruption in GPR reflectors was observed. (4) A one-point magnetic anomaly was located at the northeast comer, but its source cannot be resolved. A chaotic reflective zone to the east represents the radar signature of Building E5375 construction fill

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE93005731; NTIS; INIS; US Govt. Printing Office Dep.

Files

24051222.pdf

Files (615.6 kB)

Name Size Download all
md5:e67165d84c78c11641aaeb0f93eed075
615.6 kB Preview Download

Additional details

Additional titles

Subtitle (English)
Interim progress report

Publishing Information

Imprint Pagination
33 p.
Report number
ANL/ESD/TM--37

Optional Information

Contract/Grant/Project number
Contract W-31109-ENG-38
Funding organization
Department of Defense, Washington, DC (United States).