Faulted systems recovery experience. Final report, May 1992

Description

This report addresses the recovery (i.e., return to service from a faulted, or otherwise unavailable, condition) of important nuclear power plant front-line and support systems and equipment. It contains information based on operating experience relative to the times to recover from a variety of plant events. It also indicates the nature of the operator actions involved. This information is intended to provide useful insights to utilities who are undertaking Individual Plant Examinations (IPEs) per Generic Letter 88-20 of the Nuclear Regulatory Commission. The report provides a database of recovery experience primarily derived from Licensee Event Reports (LERs). The database contains recovery duration information for 205 demand events and 98 nondemand events. In particular, it contains recovery durations for 42 pump related and 143 valve related events that are representative of demand conditions. Experience shows that, overall, about one-half of all pumps and valves are recovered in 30 minutes or less. Specific recovery experience is dependent on the equipment type, the plant system involved, and the failure mode encountered. (author)

Availability note (English)

Available from Research Reports Center (RRC), PO Box 50490, Palo Alto, CA 94303 (United States)

Additional details

Publishing Information

Imprint Pagination
80 p.
Report number
NSAC--161

INIS

Country of Publication
United States
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
34002202
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
PROBABILISTIC ESTIMATION; PUMPS; REACTOR ACCIDENTS; REACTOR COMPONENTS; REMEDIAL ACTION; SAFETY ANALYSIS; TIME DELAY; VALVES
Descriptors DEC
ACCIDENTS; CONTROL EQUIPMENT; EQUIPMENT; FLOW REGULATORS

Optional Information

Notes
13 refs, figs, tabs