Published July 1987 | Version v1
Journal article

ARC/SPAR sealing system - Preliminary field evaluation

Description

The ARC/SPAR sealing system, based on an ultra-sonic signature and designed for sealing CANDU-type spent fuel, has been undergoing field evaluation at Gentilly-2 600 MW Reactor for the last ten months. The test was designed to evaluate the hardware and software of the system, the effort required for the application and verification of the containment and seals, the interference with operator, the procedures and the false- and missed alarm rates. Routine use conditions were emphasized throughout the test. In the course of the trial the entire content of the spent fuel in the pond was sealed. Preliminary results indicate that the system is acceptable. Hardware, software and procedures except for the transducer worked well. Transducer failure occurred too frequently at an unacceptable rate. The problem was identified and will hopefully be overcome. Level of intrusion with operations could be considered acceptable. Inspectors carrying out seal application and verification were adequately trained and performed satisfactorily. Auto- and crosscorrelations are reported. Recommendations are made for the improvement of equipment and procedures. The test will continue until the end of this year

Additional details

Publishing Information

Journal Title
Nucl. Mater. Manage.
Journal Volume
16
Series
Nucl. Mater. Manage.
Journal Page Range
400-405
ISSN
0362-0034
CODEN
NUMMB

Conference

Title
a mature technology.
Acronym
28. INMM annual meeting on safeguards
Dates
12-15 Jul 1987.
Place
Newport Beach, CA (USA).

Optional Information

Secondary number(s)
CONF-870713--.