Published September 20, 1994 | Version v1
Report Open

CSAR 81-001 addendum 2: Use of a plexiglass contamination barrier in HC-227-T

Description

Plutonium Finish Plant (PFP) Engineering requested a criticality safety evaluation (Appendix 1) to support a revision of Criticality Prevention Specification CPS-Z-165-80601 allowing a plexiglass enclosure (PGE) to be placed inside the HC-227T hood as a contamination barrier. The HC-227T hood is the receiving/transfer enclosure for Pu nitrate solution contained in Product Removal containers (PR Cans), L10 Containers (L10, Fl-10, 10 L) or L-3 Containers. Within the HC-227T, a 1.349 square meter (15 square foot) enclosure, PGE, has been created to provide contamination control around the weighing scale. Two or more standard criticality drains shall be installed on this enclosure prior to beneficial usage. The evaluation considered the normal process, spillage scenarios, waste/container accumulations within the enclosure, and interactions of Pu within the enclosure as well as other containers external to the enclosure. The results from the criticality safety analysis by CRA shows that such as contamination barrier can be placed inside the HC-227T Hood if the PGE is equipped with adequate criticality drains. In addition, other limits as well as administrative controls listed in CPS-Z-165-80601 Rev./Mod. B/0 and CPS-Z-165-80010 Rev./Mod. C/1 shall also apply

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95001644; NTIS; US Govt. Printing Office Dep.

Files

26025834.pdf

Files (526.4 kB)

Name Size Download all
md5:7634332921213a6a62d95ff87c084bc2
526.4 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
10 p.
Report number
WHC-SD-SQA-CSA--20374

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).