Published March 28, 2011 | Version v1
Report

Compensation Of Fast Kicker Rolls With Skew Quadrupoles

Description

The development of the third generation light sources lead to the implementation of the top-up operation, when injection occurs while users collect data. The beam excursions due to the non-closure of the injection bump can spoil the data and need to be suppressed. In the horizontal plane compensation can be achieved by adjusting timing and kick amplitudes. The rolls of the kicker magnets create non-closure in the vertical plane and usually there is no means for correction. In the paper we describe proposed compensation scheme utilizing two skew quadrupoles placed inside the injection bump. The third generation light sources implement top-up operation firstly introduced at Advanced Photon Source. In this mode the circulating beam current is supported near constant by frequent injection of small charge, while photon beam is delivered for users. The beam perturbations caused by the mismatched injection bump can provide undesired noise in the user data. Usually the injection trigger is distributed to the users end stations so that those affected would be able to blank data acquisition. Nevertheless, as good operational practice such transients should be suppressed as much as possible. In the horizontal plane (which is commonly used for injection) one can adjust individual kicker strength as well as trigger delay while observing motion of the stored beam centroid. In the vertical plane such means are unavailable in the most cases. The possible solutions include dedicated weak vertical kickers and motorized adjustment of the roll angle of the injection kickers. Both abovementioned approaches are expensive and can significantly deteriorate reliability. We suggest two employ two skew quadrupoles (to correct both angle and position) placed inside the injection bump. In this case the beam position itself serves as measure of the kicker strength (assuming that kickers are well matched) and vertical kicks from the skew quadrupoles will be self synchronized with injection bump. In this paper we will consider the case when injection hardware (kickers and septa) are located in the same straight. Such an approach simplifies consideration but it can be generalized.

Availability note (English)

Available from http://www.bnl.gov/isd/documents/75151.pdf; PURL: https://www.osti.gov/servlets/purl/1012576-BAFfEE/

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
BNL--94853-2011-CP

Conference

Title
2011 Particle Accelerator Conference
Dates
28 Mar - 1 Apr 2011
Place
New York, NY (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
42061092
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; ADVANCED PHOTON SOURCE; AMPLITUDES; BEAM CURRENTS; BEAM POSITION; DATA ACQUISITION; IMPLEMENTATION; KICKER MAGNETS; LIGHT SOURCES; PHOTON BEAMS; QUADRUPOLES; RELIABILITY; TRANSIENTS
Descriptors DEC
BEAMS; CURRENTS; EQUIPMENT; MAGNETS; MULTIPOLES; RADIATION SOURCES; STORAGE RINGS; SYNCHROTRON RADIATION SOURCES

Optional Information

Contract/Grant/Project number
AC02-98CH10886
Funding organization
DOE - Office Of Science (United States)