Published January 31, 2001 | Version v1
Report

Plutonium Immobilization Can Loading Conceptual Design for 13 MT Case

Description

The Plutonium Immobilization Plant (PIP) will encapsulate plutonium in ceramic pucks and seal the pucks inside welded cans. Remote equipment will place these cans in magazines and the magazines in a Defense Waste Processing Facility (DWPF) canister. The DWPF will fill the canister with glass for permanent storage. This report discusses the Plutonium Immobilization Can Loading conceptual design for the 13 Metric Ton (MT) PIP throughput case. This report includes a process block diagram, process description, and preliminary equipment specifications and documents the changes to the original can loading concept documented in previous reports

Availability note (English)

Available from https://www.osti.gov/servlets/purl/774273-KqdvoO/native/

Additional details

Publishing Information

Imprint Pagination
[vp.]
Report number
WSRC-TR--2000-00018

Optional Information

Contract/Grant/Project number
AC09-96SR18500
Funding organization
US Department of Energy (United States)