Published September 26, 2011 | Version v1
Journal article

Operation Status of the J-PARC Negative Hydrogen Ion Source

  • 1. J-PARC Center, Tokai-mura, Naka-gun, Ibaraki-ken 319-1195 (Japan)

Description

A cesium-free negative hydrogen ion source driven with a lanthanum hexaboride (LaB6) filament is being operated without any serious trouble for approximately four years in J-PARC. Although the ion source is capable of producing an H- ion current of more than 30 mA, the current is routinely restricted to approximately 16 mA at present for the stable operation of the RFQ linac which has serious discharge problem from September 2008. The beam run is performed during 1 month cycle, which consisted of a 4-5 weeks beam operation and a few days down-period interval. At the recent beam run, approximately 700 h continuous operation was achieved. At every runs, the beam interruption time due to the ion source failure is a few hours, which correspond to the ion source availability of more than 99%. The R and D work is being performed in parallel with the operation in order to enhance the further beam current. As a result, the H- ion current of 61 mA with normalized rms emittance of 0.26 πmm.mrad was obtained by adding a cesium seeding system to a J-PARC test ion source which has the almost same structure with the present J-PARC ion source.

Additional details

Identifiers

Publishing Information

Journal Title
AIP Conference Proceedings
Journal Volume
1390
Journal Issue
1
Journal Page Range
p. 235-244
ISSN
0094-243X
CODEN
APCPCS

Conference

Title
2. international symposium on negative ions, beams and sources
Dates
16-19 Nov 2010
Place
Takayama City (Japan)

INIS

Optional Information

Notes
(c) 2011 American Institute of Physics