Published August 1990
| Version v1
Miscellaneous
Open
TASCC newsletter. Vol. 4 no. 8
Description
The tandem accelerator was shut down for two weeks for installation of a set of four new pelletron charging chains and a conductive pulley system. A new mounting assembly was also installed on the low-energy buncher. Before the shutdown two 8-pi experiments, and ISOL experiment, and a cyclotron beam development run were performed. Following the shutdown a steel sample was irradiated with deuterons, tests were made of detectors in the Q3D spectrometer, and another 8-pi experiment was started. A five-day run in the cyclotron with carbon 12 accelerated to 10 MeV/nucleon was used to investigate wto methods of calculating trim-rod settings. (L.L.)
Availability note (English)
MF available from INIS under the Report Number.Files
24059350.pdf
Files
(83.1 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:5441174242f7257213cbf3ab50ad1699
|
83.1 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 4 p.
- Report number
- INIS-mf--13659
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 24059350
- Subject category
- S43: PARTICLE ACCELERATORS;
- Descriptors DEI
- CRNL MP TANDEM ACCELERATOR; CRNL SUPERCONDUCTING CYCLOTRON; RESEARCH PROGRAMS
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; CYCLOTRONS; ELECTROSTATIC ACCELERATORS; HEAVY ION ACCELERATORS; ISOCHRONOUS CYCLOTRONS; TANDEM ELECTROSTATIC ACCELERAT; VAN DE GRAAFF ACCELERATORS