Progress report on fast breeder reactor development in Japan, June-March, 1979

Description

The experimental fast reactor ''Joyo'' started the second cycle operation of 50 MW on January 12, and finished it on February 26. The operation was very stable throughout this period. The preparation to raise the output to 75 MW has been in progress since then in parallel with the periodic inspection. Experimental fuel subassemblies and a control rod used for the 50 MW operation were removed. Installations of a fuel storage and handling facility, a water cooling and purifying plant, and an in-water cutting equipment were completed. The works related to the analysis of the core characteristics are reported. The construction preliminary design (2) of the prototype fast reactor ''Monju'' was finished. The wind tunnel experiment and the calculation of earthquake response to artificial seismic waves are being carried on. The works of developing codes and the surveys on the construction site are reported. The fourth preliminary design of the demonstration fast reactor was completed. The research and development of reactor physics, structural components, instrumentation and control, sodium technology, fuel materials, structures and structural materials, safety and steam generators are reported. The technological investigation into foreign LMFBRs was finished. (Kako, I.)

Availability note (English)

MF available from INIS under the Report Number.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
19 p.
Report number
PNC-N--251-79-06