Overload handling of IBT using load and capacitor shedding
- 1. Department of Electrical Engineering, Faculty of Engineering, Universitas Indonesia, Depok, 16424 (Indonesia)
Description
Faulted Inter Bus Transformer (IBT) can cause power system instability. Therefore, it will be isolated to prevent the spreading of disturbance. IBT at the Ptn Substation which supplies Ptn – Grt and Dwt Subsystem is discussed in this paper. The event discussed is 2 of 3 IBTs are out of work so that only one left. So, load shedding of Dwt Subsystem is required to avoid further disturbance. However, after it is applied, the voltage at the Dwt Subsystem will increase beyond the allowed rating. Therefore, further action is required by releasing some capacitor banks of several substations that have the highest rated voltage until the voltage in all substations is within the permitted rating. Finally, The system return to stable after load shedding with total 226.45 MW and capacitor shedding with total 150 Mvar. (paper)
Availability note (English)
Available from http://dx.doi.org/10.1088/1757-899X/673/1/012056Additional details
Identifiers
Publishing Information
- Journal Title
- IOP Conference Series. Materials Science and Engineering (Online)
- Journal Volume
- 673
- Journal Issue
- 1
- Journal Page Range
- [10 p.]
- ISSN
- 1757-899X
Conference
- Title
- International Conference on Broad Exposure to Science and Technology 2019
- Acronym
- BEST2019
- Dates
- 7-8 Aug 2019
- Place
- Bali (Indonesia)
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 54076117
- Subject category
- S42: ENGINEERING;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CAPACITORS; ELECTRIC POTENTIAL; INSTABILITY; PERFORMANCE; POWER SYSTEMS; TRANSFORMERS
- Descriptors DEC
- ELECTRICAL EQUIPMENT; ENERGY SYSTEMS; EQUIPMENT