Marviken test-data interpretation, second project

Description

A brief description is given of the investigations carried out and the corclusions drawn within the MARTIN-II project, which involved the evaluation and interpretation of the data from the full scale containment response tests at the Marviken Power Station. The data from the tests, which were completed in 1976, provide information about the periodic pressure oscillations and rapid pressure spikes induced in the pressure-suppression containment during study comprise the following items: - Influence of test parameters on pressure oscillations and pressure spikes - Pressure spikes in the wetwell pool - High frequency oscillations - Comparisons between single-pipe and multi-pipe data The study was carried out by Studsvik Energiteknik AB with consulting efforts from AB ASEA-ATOM. It was financed by the Swedish Nuclear Power Inspectorate. (Auth.)

Availability note (English)

MF available from INIS under the Report Number.

Files

11544079.pdf

Files (1.2 MB)

Name Size Download all
md5:8b0e58c74c4105d2c729c14ff5ed7275
1.2 MB Preview Download

Additional details

Additional titles

Subtitle (English)
Summary and condusions
Augmented title (English)
A brief discussion of the full scale containment response tests at Marviken

Publishing Information

Imprint Pagination
76 p.
Report number
STUDSVIK/K2X--78-13

Optional Information

Secondary number(s)
MARTIN--231.