Published January 2007 | Version v1
Miscellaneous

Present status of the JAEA TOKAI tandem accelerator

Description

The TOKAI tandem accelerator was operated for 182 days (4,300 hours) in fiscal 2005. The maximum terminal voltage reached 19.1 MV. Twenty one ion species including 18O, 1H and 7Li were accelerated as required. The radioactive ion accelerator became operational in November, 2005. 47% of the operated hours was for nuclear physics, 29% was for irradiations on solids and atoms/molecules, and 18% was for nuclear chemistry. The superconducting booster was operated for 34 days, which occupied 19% of the total operation days. (K.Y.)

Part of:
Proceedings of the 19th meeting for tandem accelerators and related techniques

Additional details

Additional titles

Original title (Japanese)
Dai-19-kai tandem kasokuki oyobi sono shuhen gijutsu no kenkyukai hokokushu

Publishing Information

Imprint Title
Proceedings of the 19th meeting for tandem accelerators and related techniques
Imprint Pagination
117 p.
Journal Page Range
p. 9-12

Conference

Title
19. meeting for tandem accelerators and related techniques
Dates
1-2 Jul 2006
Place
Midori, Gunma (Japan)

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
38065909
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ECR ION SOURCES; IRRADIATION; JAERI TANDEM ACCELERATOR; MANAGEMENT; MONTHLY VARIATIONS; NUCLEAR CHEMISTRY; NUCLEAR PHYSICS; OPERATION; PARTICLE BOOSTERS; RADIOACTIVE ION BEAMS
Descriptors DEC
ACCELERATORS; BEAMS; CHEMISTRY; ELECTROSTATIC ACCELERATORS; ION BEAMS; ION SOURCES; PHYSICS; TANDEM ELECTROSTATIC ACCELERATORS; VAN DE GRAAFF ACCELERATORS; VARIATIONS

Optional Information

Notes
5 refs., 5 figs. Imprint:Dai-19-kai tandem kasokuki oyobi sono shuhen gijutsu no kenkyukai hokokushu