Toshiba's developments on construction techniques of nuclear power plants
Creators
Description
Reliable and economic energy supplies are fundamental requirements of energy policies in Japan. To accomplish these needs, nuclear power plants are being increased in Japan. In recent years, construction cost increases and schedule extensions have affected the capital cost of nuclear energy, compared with fossil power plants, due to lower costs of oil and coal. On the other hand, several severe regulations have been applied to nuclear power plant designs. High-quality and cooperative engineering and harmonized design of equipment and parts are strongly required. Therefore, reduced construction costs and scheduling, as well as higher quality and reliability, are the most important items for nuclear industry. Toshiba has developed new construction techniques, as well as design and engineering tools for control and management, that demonstrate the positive results achieved in the shorter construction period of 1100-MW(electric) nuclear power plants. The normal construction period so far is 64 months, whereas the current construction period is 52 months. (New construction techniques are partially applied). In future years, the construction period will be lowered to 48 months. (New construction techniques are fully applied). A construction period is defined as time from the start of rock inspection to the start of commercial operation
Additional details
Publishing Information
- Journal Title
- Transactions of the American Nuclear Society
- Journal Volume
- 55
- Series
- Trans. Am. Nucl. Soc.
- Journal Page Range
- 494-495
- ISSN
- 0003-018X
- CODEN
- TANSA
Conference
- Title
- American Nuclear Society winter meeting.
- Dates
- 15-19 Nov 1987.
- Place
- Los Angeles, CA (USA).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 20004100
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONSTRUCTION; COST; INSPECTION; JAPAN; MANAGEMENT; NUCLEAR POWER PLANTS; OPTIMIZATION; PLANNING; PRODUCTIVITY; REACTOR OPERATION; REGULATIONS; SCHEDULES; SPECIFICATIONS
- Descriptors DEC
- ASIA; DEVELOPED COUNTRIES; LAW; NUCLEAR FACILITIES; OPERATION; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Secondary number(s)
- CONF-8711195--.