Solid waste burial grounds interim safety analysis
Description
This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE95000438; NTIS; US Govt. Printing Office Dep.Files
26022279.pdf
Files
(8.2 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:0f65ea201243f05c539189f6b017e291
|
8.2 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 452 p.
- Report number
- WHC-SD-WM-SARR--028
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26022279
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; S58: GEOSCIENCES;
- Descriptors DEI
- DESIGN; GROUND DISPOSAL; RADIOACTIVE WASTE DISPOSAL; RADIOACTIVE WASTE MANAGEMENT; SAFETY ANALYSIS; SECURITY
- Descriptors DEC
- MANAGEMENT; WASTE DISPOSAL; WASTE MANAGEMENT
Optional Information
- Contract/Grant/Project number
- Contract AC06-87RL10930
- Funding organization
- USDOE, Washington, DC (United States).