Optimization of physics start up test

  • 1. Guangdong Nuclear Power Joint Venture Corporation, Shenzhen (China)

Description

Physics start up test that must be performed at the beginning of each cycle is essential test required by nuclear safety and power plant normal operation. The authors do completely optimization for physics start up test, after the authors have studied the experience coming from worldwide practice and ourselves. Include: to cancel redundant items during zero power physics test, successfully solve the problems due to positive moderator temperature coefficient, redefine the power level at which the physics test should be performed before full power, to improve the method of ex-core instrument calibration. New physics start up test program short the test time, avoid the waste of manpower and material source, improve unit capability and get considerable economic benefit

Part of:
Proceedings for Sino-French scientific conference nuclear power plant

Additional details

Publishing Information

Imprint Title
Proceedings for Sino-French scientific conference nuclear power plant
Imprint Pagination
194 p.
Journal Page Range
p. 50-53

Conference

Title
Sino-French scientific conference on nuclear power plant
Dates
5-7 Dec 2000
Place
Shenzhen (China)

Optional Information