Published July 2015 | Version v1
Report

R&D cavity fabrication and evaluation in CFF

  • 1. High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)

Description

In KEK, superconducting cavities could be manufactured internally by using cavity fabrication facility (CFF), and other existing equipment in mechanical-engineering center. For KEK#01 9-cell cavity, 36MV/m accelerating electric field was recorded by a vertical test. To sophisticate the cavity performance and also manufacturing skills including selection rules of the cavity material, several types of test cavity constructions and evaluation tests are now undergoing. (author)

Part of:
Proceedings of the 16th KEK mechanical engineering workshop

Additional details

Additional titles

Original title (Japanese)
CFFにおけるR&D空洞の製造と評価

Publishing Information

Imprint Title
Proceedings of the 16th KEK mechanical engineering workshop
Imprint Pagination
109 p.
Journal Page Range
p. 82-85
Report number
KEK-PROC--2015-1

Conference

Title
16. KEK mechanical engineering workshop
Dates
10 Apr 2015
Place
Tsukuba, Ibaraki (Japan)

Optional Information

Notes
5 refs., 3 figs., 1 tab. Imprint:#7B2C#16#56DE##9AD8##30A8##30CD##7814##30E1##30AB##FF65##30EF##30FC##30AF##30B7##30E7##30C3##30D7##5831##544A##96C6#