Published August 31, 2004 | Version v1
Report

Sampling and Hydrogeology of the Vadose Zone Beneath the 300 Area Process Ponds

Description

Four open pits were dug with a backhoe into the vadose zone beneath the former 300 Area Process Ponds in April 2003. Samples were collected about every 2 feet for physical, chemical, and/or microbiological characterization. This reports presents a stratigraphic and geohydrologic summary of the four excavations

Availability note (English)

Available from http://www.pnl.gov/main/publications/external/technical_reports/PNNL-14834.pdf; PURL: https://www.osti.gov/servlets/purl/966668-U65Lhw/

Additional details

Publishing Information

Imprint Pagination
vp.
Report number
PNNL--14834

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
40109480
Subject category
S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS; S99: GENERAL AND MISCELLANEOUS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
BIOGEOCHEMISTRY; GEOCHEMISTRY; HYDROLOGY; MICROORGANISMS; SAMPLING; SETTLING PONDS; SITE CHARACTERIZATION; STRATIGRAPHY
Descriptors DEC
CHEMISTRY; GEOCHEMISTRY; GEOLOGY; PONDS; SURFACE WATERS

Optional Information

Contract/Grant/Project number
EY3542301; AC05-76RL01830
Notes
doi 10.2172/966668
Funding organization
US Department of Energy (United States)