Published February 7, 2013
| Version v1
Journal article
Long baseline neutrino beams at Fermilab
Description
Fermilab has had a very active long baseline neutrino program since initiation of the NuMI project in 1998. Commissioned in 2005, the NuMI beam with 400 kW design power has been in operation for the MINOS neutrino oscillation program since that time. Upgrade of NuMI to 700 kW for NOvA is now well advanced, with implementation of the beam upgrades to be accomplished in 2012–2013. Design development for the next generation LBNE neutrino beam is now a major ongoing effort. We report here salient features and constraints for each of these beams, as well as significant challenges both experienced and expected.
Availability note (English)
Available from http://dx.doi.org/10.1088/1742-6596/408/1/012007Additional details
Identifiers
Publishing Information
- Journal Title
- Journal of Physics. Conference Series (Online)
- Journal Volume
- 408
- Journal Issue
- 1
- Journal Page Range
- [8 p.]
- ISSN
- 1742-6596
Conference
- Title
- 13. international workshop on neutrino factories, super beams and beta beams
- Acronym
- NUFACT11
- Dates
- 1-6 Aug 2011
- Place
- Geneva (Switzerland)
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 44059216
- Subject category
- S46: INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY; S43: PARTICLE ACCELERATORS; S72: PHYSICS OF ELEMENTARY PARTICLES AND FIELDS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BEAM PRODUCTION; DESIGN; EXPERIMENT PLANNING; FERMILAB; IMPLEMENTATION; MULTIPARTICLE SPECTROMETERS; NEUTRINO BEAMS; NEUTRINO OSCILLATION; NEUTRINOS; OPERATION; PARTICLE IDENTIFICATION
- Descriptors DEC
- BEAMS; ELEMENTARY PARTICLES; FERMIONS; LEPTON BEAMS; LEPTONS; MASSLESS PARTICLES; MEASURING INSTRUMENTS; NATIONAL ORGANIZATIONS; PARTICLE BEAMS; PLANNING; SPECTROMETERS; US DOE; US ORGANIZATIONS