Published December 2018 | Version v1
Journal article

Cause Analysis and Treatment of Pipeline Vibration of Check Valve in Fuqing Nuclear Power Plant

  • 1. Fujian Fuqing Nuclear Power Co. Ltd., Fuqing (China)
  • 2. CNNC Key Laboratory on Reactor Thermal Hydraulic Technology, Chengdu (China)

Description

The auxiliary steam converter system (STR) of Unit 2 of Fuqing Nuclear Power Plant drains from the drain to the deaerator line during normal power operation. The severe vibration of the pipeline poses potential hidden dangers to the safety, stability and economic operation of the nuclear power plant. According to the analysis of the vibration problem of this pipeline, the theoretical analysis of the amount of hydrophobicity during normal power operation is carried out to find out the root cause of the severe vibration of the analysis pipeline, and corresponding special treatment measures are formulated according to the analysis and the experience of vibration treatment at home and abroad, and finally the vibration is eliminated completely to make the system safe and reliable. (authors)

Additional details

Identifiers

Publishing Information

Journal Title
Nuclear Power Engineering
Journal Volume
39
Journal Issue
S2
Journal Page Range
p. 154-156
ISSN
0258-0926

INIS

Country of Publication
China
Country of Input or Organization
China
INIS RN
54087585
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Descriptors DEI
DEAERATORS; NUCLEAR POWER PLANTS; OPERATION; PIPELINES; POTENTIALS; SAFETY; STABILITY; STEAM; VALVES
Descriptors DEC
CONTROL EQUIPMENT; EQUIPMENT; FLOW REGULATORS; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS

Optional Information

Notes
1 fig., 1 tab., 2 refs.; http://dx.doi.org/10.13832/j.jnpe.2018.S2.0154